Operational Excellence Implemented system and documents

Lean Transformation Programme

Transformation programme reducing waste through 5S, Kaizen, value stream mapping and visual management, with measurable results on the shop floor.

Deliverable
Implemented system and documents
Typical Duration
~30 days

Transformation programme reducing waste through 5S, Kaizen, value stream mapping and visual management, with measurable results on the shop floor.

How We Work

  1. 1 Discovery meeting and current state analysis
  2. 2 Scope, schedule and deliverables agreed
  3. 3 Design and documentation
  4. 4 Implementation and on-site work
  5. 5 Team training and handover
  6. 6 Result measurement and follow-up